Our to produce better steel-based products are the main used in industrial manufacturing various types Stainless SteelLow-alloyed steel tube plate,Low-alloyed steel tube Round Bar,Low-alloyed steel tube forgings,Low-alloyed steel tube suppliers, Low-alloyed steel tube Stock,Low-alloyed steel tube sheet, Low-alloyed steel tube flat bar, Low-alloyed steel tube pipe,Low-alloyed steel tube tube,Low-alloyed steel tube mould,Low-alloyed steel tube round ingot,Low-alloyed steel tube cold-rolled steel,Low-alloyed steel tube coil,Low-alloyed steel tube strap steel,Low-alloyed steel tube hot-rolled steel,Low-alloyed steel tube medium plate, Low-alloyed steel tube heavy plate,Low-alloyed steel tube shapped bar,Low-alloyed steel tube hexahedral bar,Low-alloyed steel tube,Low-alloyed steel tube slab ingot,Low-alloyed steel tube slab,Low-alloyed steel tube price,Low-alloyed steel tube square bar,Low-alloyed steel tube square steel,Low-alloyed steel tube wire.Extending the industrial all kinds of mechanical industrial parts machining and, at the same time, using fine heat treatment process,tempering,hardening,heating,bright annealing,rotary hearth.chemical composition and Improving mechanical properties of Low-alloyed steel tube.

Current Location:Home » Products » Stainless Steel » Low-alloyed steel tube

Product category

Low-alloyed steel tube

Data Table for:Products: Stainless Steel:Low-alloyed steel tube

Low-alloyed steel tube properties and heat treatment forged piece, Including Low-alloyed steel tube application and specifications, We have all specifications,Including Low-alloyed steel tube steel plate, Low-alloyed steel tube sheet, Low-alloyed steel tube square steel, Low-alloyed steel tube flat bar,Low-alloyed steel tube round bar,Low-alloyed steel tube forgings, we can own production and sales.


Introduction to Our Products:

Specialized high quality steel

We have the advantages of equipment, technologies and price

forged/hot rolling/ extrusion of steel


We can produce the Low-alloyed steel tube has the following specifications:

Round bar steel: 1mm to 3000mm

Square-shape steel: 1mm to 2000mm

Plate steel:0.1mm to 2500mm

Width: 10mm to 2500mm

Lenth: We can supply any lenth based on the customer's requirement.

Forging: Shafts with flanks/pipes/tubes/slugs/donuts/cubes/other shapes

Tubings: OD: φ6-219 mm, with wall thickness ranging from 1-35 mm.

Finished goods condition: hot forging/hot rolling + annealing/normalizing + tempering/quenching + tempering/any conditions based on the customer's requirement

Surface conditions: scaled (hot working finish)/ground/rough machining/fine machining/based on the customer's requirement

Furnaces for metallurgical processing: electrode arc + LF/VD/VOD/ESR/Vacuum consumable electrode.

Ultrasonic inspection: 100% ultrasonic inspection for any inperfections or based on the customer's requirementExcellent service for all kinds of industries,with advantages of technologies, equipment and price.

We serve you with our honesty, integrity, and professionality.


Chemical composition % of the ladle analysis of grade Low-alloyed steel tube and Standards

The invention provides a production method of a low alloy steel continuous casting round tube blank with the diameter of Phi 350 to Phi 400mm, comprising the following steps: the process conditions of a round tube blank crystallizer which is applicable to the ratio of the arc-shaped radius of a continuous casting machine and the diameter of the low alloy steel continuous casting round tube blank of 26.25 to 30 are selected; the parameters for low alloy steel casting blank cooling are selected; the low alloy steel casting blank secondary cooling system is prepared; and the parameters of the continuous casting process of the low alloy steel continuous casting blank are selected. The production method has the effects that the production method can ensure the quality of the low alloy steel casting blank to be in line with the requirements of the continuous casting process of the continuous casting round tube blank under the equipment condition that the ratio of the arc-shaped radius of the continuous casting machine and the diameter of the continuous casting round tube blank is 26.25 to 30.The non-round degree, the end-surface cut square, the curvature, the defects of the acid leaching macrostructures, the acid leaching macrostructures and the surface quality of the produced casting blank with the diameter of Phi 350 to Phi 400mm are all in line with the requirements of continuous casting round tube blank YB/T 4149-2006 of the black metallurgical industry standards of the People's Republic of China.



Machining performance

Download Low-alloyed steel tube the mechanical properties of the report, the report provides detailed performance analysis and application. Download >>


Principal Design Features

One of the most widely used precipitation hardening grades in the business. While soft and ductile in the solution annealed condition, it is capable of high properties with a single precipitation or aging treatment. Characterized by good corrosion resistance, high harness, toughness and strength.


Machinability

Long, gummy chips characterize this alloys machinability. It can be machined in the annealed condition, however condition H1150M will yield best results. Post machining solution treatment of parts will be required prior to final hardening if machining in this condition.


Heat Treatment

CONDITION A--Soak at 1900 F (1038 C) for 30 minutes and cool below 60 F (16 C) for complete martensite transformation. CONDITION H 950- Treat Condition A material at 900 F(482 C) for 1 hour, air cool.. CONDITION H925, H1025, H1075, H1100, H1150- Soak solution treated material for 4 hours at specified temperature, air cool, CONDITION H1150M- Soak solution treated material at 1400 F (760 C) for 2 hours, air cool, then re-heat to 1150 F (620 C) for 4 hours and air cool.


Welding

Successfully welded by common fusion and resistance methods, this alloy should not be joined by oxyacetylene welding. AWS E/ER630 filler metal is recommended if required.


Forging

Soak for 1 hour at 2150 F (1177 C) prior to forging. Do not work below 1850 F (1010 C). Post-work solution treatment is required prior to final hardening.





Hot tags:Low-alloyed steel tube steel plate, Low-alloyed steel tube sheet, Low-alloyed steel tube square steel, Low-alloyed steel tube flat bar,Low-alloyed steel tube round bar,Low-alloyed steel tube forgings